Home Mega Projects Dholera expressway toll: what is notified, what is not
Mega Project

Dholera expressway toll: what is notified, what is not

Updated 10 August 20266 min readSourced and dated
The short answer

A toll notification exists, but a public rate card for the full Ahmedabad to Dholera run does not. The Ministry of Road Transport and Highways issued a toll notification dated 1 May 2025 covering the Bhavnagar-side sections: NH-751 from Nari Junction to Adhelai, 30.727 km tollable, and NE-8 from Adhelai to Dholera SIR, 23.860 km, with the plaza near Bhadbhid village (confirmed). The report of that notification lists no per-car rupee rates. The Rs 220 to 320 car figures circulating online appear only on promotional sites as estimates, so we do not publish them. Tolling runs on FASTag under the National Highways Fee Rules framework, with rates revised annually. Check the plaza rate card before you drive.

The Ahmedabad to Dholera expressway has been open to traffic since 31 March 2026 (confirmed), and the first question most drivers ask is the one this page answers with unusual honesty: what does it cost? The short version is that a toll notification exists for specific sections, a consolidated public rate card for the full Ahmedabad to Dholera run could not be verified as of 10 August 2026, and the rupee figures you have probably seen online are estimates published by plot-selling websites, not government rates. This page separates the notified from the circulated.

What is actually notified

On 6 May 2025, DeshGujarat reported a Ministry of Road Transport and Highways toll notification dated 1 May 2025 covering the Bhavnagar-side approach to Dholera (confirmed). Two sections are named: NH-751 from Nari Junction to Adhelai, with 30.727 km tollable, and NE-8 from Adhelai to Dholera SIR, covering 23.860 km. The toll plaza sits near Bhadbhid village in Bhavnagar district. That notification is the concrete, checkable fact in this story.

What the report of that notification does not contain is a per-vehicle rupee schedule. It establishes that these sections are tolled and where the plaza is, and rates then flow from the standard national framework rather than from a Dholera-specific announcement.

What is NOT verified

The Rs 220 to 320 car figures are unverified. Those numbers circulate on promotional and plot-selling sites as estimates for the Ahmedabad to Dholera run. No NHAI rate card and no reputable outlet publishing them could be found as of 10 August 2026. We do not publish unverified rates, and a site quoting them as fact is telling you something about its sourcing standards.

This is not pedantry. Toll rates feed directly into the running-cost math that sellers use in investment pitches, and a made-up toll is a small lie that calibrates you to accept bigger ones. If a rate matters to your decision, get it from the plaza or the official portal on the day, not from a brochure.

How NH tolls are set, in general

National highway tolls in India run under the National Highways Fee Rules framework: rates are set per vehicle class against the section's length and structure costs, revised annually, and collected electronically through FASTag, which is mandatory for cars at national highway plazas. Return-trip and monthly-pass discounts exist within the framework at notified plazas. None of that is Dholera-specific, which is exactly the point: when the consolidated rate card for this corridor is published, it will follow this standard shape, and any figure that arrives outside it deserves scepticism.

What to check before you drive

  1. The plaza rate card itself: NHAI publishes toll plaza information, including per-class rates, on its official toll information portal; search for the Bhadbhid plaza or the NH-751 section.
  2. Your FASTag balance and validity, since the corridor tolls electronically.
  3. The tolled boundaries: the notified sections sit on the Bhavnagar-side approach (Nari Junction to Adhelai to Dholera SIR), so where you join and leave the corridor changes what you pay.
  4. The date of any rate you are quoted: NH tolls revise annually, so a 2025 figure is not a 2026 fact.

What this means for a Dholera trip

For the road itself, the picture is good and confirmed: roughly 109 km of access-controlled four-lane expressway connects Ahmedabad to Dholera, open since 31 March 2026 (confirmed), with the drive covered in our expressway guide and the wider access picture in the connectivity overview. For the cost of that drive, the honest state of the record as of 10 August 2026: sections notified, plaza located, framework standard, consolidated public rate card for the full run not verifiable. We will treat a published NHAI rate card as the only source worth updating this page for.

Frequently asked questions

How much is the toll from Ahmedabad to Dholera?
A consolidated public rate card for the full run could not be verified as of 10 August 2026. What exists is a MoRTH notification dated 1 May 2025 covering NH-751 Nari Junction to Adhelai (30.727 km tollable) and NE-8 Adhelai to Dholera SIR (23.860 km), plaza near Bhadbhid village (confirmed). The Rs 220 to 320 car figures circulating online are unverified estimates from promotional sites. Check the plaza rate card on the day.
Is the Dholera expressway tolled?
Yes, in notified sections. The MoRTH notification of 1 May 2025 names NH-751 Nari Junction to Adhelai and NE-8 Adhelai to Dholera SIR as tolled, with the plaza near Bhadbhid village in Bhavnagar district (confirmed). Collection runs on FASTag under the standard national framework.
Where is the Dholera expressway toll plaza?
Near Bhadbhid village in Bhavnagar district, per the MoRTH notification of 1 May 2025 (confirmed). It serves the notified sections on the Bhavnagar-side approach: NH-751 Nari Junction to Adhelai and NE-8 Adhelai to Dholera SIR.
Why does every website quote a different Dholera toll?
Because no consolidated official rate card for the full Ahmedabad to Dholera run was publicly verifiable as of 10 August 2026, and promotional sites fill the gap with estimates. NH toll rates also revise annually, so even a once-correct figure ages. The only reliable source is the plaza rate card or the official NHAI toll portal.

Sources

  • DeshGujarat, 6 May 2025 (MoRTH toll notification dated 1 May 2025: NH-751 Nari Junction to Adhelai, 30.727 km tollable; NE-8 Adhelai to Dholera SIR, 23.860 km; plaza near Bhadbhid village, Bhavnagar district; no per-car rates listed in the report). Confirmed.
  • MoRTH and NHAI announcements, March 2026 (Ahmedabad to Dholera expressway, NH-751, about 109 km, open to traffic 31 March 2026). Confirmed.
  • Promotional and plot-selling websites, checked August 2026 (Rs 220 to 320 car-rate claims presented as estimates; no official source found). Unverified, not published as fact.
  • National Highways Fee (Determination of Rates and Collection) Rules framework (per-class rates, annual revision, FASTag collection). Confirmed as the governing framework; no Dholera-specific rate stated here.