Home Answers How to reach Dholera?
Quick Answer

How to reach Dholera?

Updated 22 July 20265 min readSourced and dated
The short answer

The main way to reach Dholera today is by road from Ahmedabad, about 100 km southwest, using the roughly 109 km Ahmedabad-Dholera Expressway that was reported inaugurated in March 2026 and targets a drive of around 40 minutes. A semi-high-speed rail line is approved for 2030-31, and a local international airport is reported around 80 percent built but not yet open. The nearest working airport is Ahmedabad.

For now, reaching Dholera means driving from Ahmedabad. That is the honest headline. The road has improved dramatically with the new expressway, and rail and a local airport are on the way, but as of mid-2026 the car is how you get there. Here is each option with a clear status so you can plan a real trip, not a brochure one.

By road, the way to go today

From Ahmedabad, Dholera SIR is about 100 km to the southwest. The main link is the Ahmedabad-Dholera Expressway, roughly 109 km, a four-lane greenfield access-controlled highway with a 120 km/h design speed, reported inaugurated on 31 March 2026. It targets a drive time of around 40 minutes, down from about two to two and a quarter hours on the old road. Verify whether it is fully open end to end before assuming the 40-minute figure for your trip. The tolled section uses FASTag. See every route in the connectivity overview or on the connectivity explorer.

~100 km
from Ahmedabad
~40 min
expressway drive target
~109 km
expressway length
FASTag
electronic tolling

By air, for now via Ahmedabad

There is no operational airport at Dholera yet. Dholera International Airport, near Navagam village about 20 km from the SIR core, is reported around 80 percent complete with operations targeted for September to October 2026, but that is a target and Dholera airport dates have slipped before. Until it opens, fly into Ahmedabad and drive the expressway. When the Dholera airport does open, it will put an international gateway within a short drive of the city.

Do not plan around the local airport yet. It is not open. Treat the September to October 2026 operations target as a target, and use Ahmedabad airport plus the expressway as your reliable route until flights are confirmed by a primary source.

By rail, later this decade

A semi-high-speed rail line from Ahmedabad (Sarkhej) to Dholera was approved by the CCEA in May 2026 at Rs 20,667 crore, a roughly 134 km double line targeted for 2030-31. Press reports mention speeds up to 220 km/h and a Sabarmati to Dholera time of about 48 minutes, but those figures are press-sourced, not in the official approval text. A metro or MRTS link is planned but not sanctioned. So rail is a future option, not a current one.

ModeStatusPractical for a trip now?
Expressway (road)Reported open Mar 2026Yes
Ahmedabad airport + driveOperationalYes
Dholera airport~80% built, not openNo
Semi-high-speed railApproved, 2030-31 targetNo
As of July 2026, road from Ahmedabad is the reliable way to reach Dholera.

Frequently asked questions

How do I get to Dholera from Ahmedabad?
Drive about 100 km southwest on the Ahmedabad-Dholera Expressway, reported inaugurated in March 2026, which targets around 40 minutes. The old road took roughly two to two and a quarter hours.
Is there an airport at Dholera?
Dholera International Airport is being built about 20 km from the SIR core and is reported around 80 percent complete, but it is not open. Operations are targeted for September to October 2026. For now, fly into Ahmedabad and drive.
Can I reach Dholera by train?
Not yet. A semi-high-speed rail line was approved in May 2026, targeted for 2030-31. Until then, road is the way in.
Which is the nearest working airport to Dholera?
Ahmedabad, roughly 100 km away, connected by the expressway. It remains the practical air gateway until the local Dholera airport opens.

Sources

  • Expressway spec and inauguration reports (~109 km, reported 31 March 2026, FASTag tolling).
  • Airport status reports, July 2026 (~80% complete, operations targeted Sept-Oct 2026).
  • PIB Release ID 2260624 (semi-high-speed rail approved). See our sources page.